Heating and cooling a New York building
Most of the city's buildings were finished before air conditioning existed. Every system since has had to be fitted into brick, plaster and somebody else's rules. Pick a number on the drawing to read about that part of the building.
- 1Steam radiators and boilersBanging pipes, air vents, uneven heat, and where heat pumps fit
- 2Window units, sleeves and PTACsWhat each one does well, compared with a mini split
- 3Where the outdoor unit can goRoof, rear yard, wall bracket, and who has to approve it
- 4Ductless mini splitsHow they work and how the lines get through masonry
- 5Central air without the ductwork you don't haveSoffits, small-duct systems and ducted mini splits
- 6Forced-air furnacesAFUE, venting in attached houses, repair or replace
- 7Rooftop units over a shop or restaurantCutting the bill in a small commercial space
- 8Walk-ins and reach-insKeeping commercial refrigeration cold and out of trouble
What fits which kind of building
The right system depends less on the equipment than on the building: who owns the walls, where a pipe or a line can run, and where heat can be thrown outdoors without bothering a neighbor. This table is a starting point, with a guide behind each row.
| Building | Usual heat | Cooling that tends to work | The hard part |
|---|---|---|---|
| Pre-war apartment, rental or co-op | One-pipe steam run by the building | Window units, or a mini split if the building allows an outdoor unit | Approval, and a place for the condenser |
| Post-war tower with wall sleeves | Steam or hot water through PTACs, or building risers | A replacement PTAC or sleeve unit sized to the existing opening | Matching the sleeve and the building's hookups |
| Brownstone or row house | Steam or hot-water boiler, sometimes a furnace | Multi-zone mini split, or small-duct or ducted systems floor by floor | Routing lines and drains through four stories of masonry |
| Detached or semi-detached house | Forced-air furnace or boiler | Central air on existing ducts, or a heat pump | Duct condition and side-yard clearances |
| Restaurant, deli or shop | Rooftop unit or the building's system | Rooftop unit, plus refrigeration that throws its own heat | Kitchen exhaust, makeup air and roof access |
Before any work starts
In New York the equipment is usually the easy decision. The slow parts are permissions and access. A renter needs the landlord's written consent for anything beyond a window unit. A co-op or condo owner normally signs an alteration agreement and waits for the board and the building's engineer or architect. Electrical, gas and structural work is filed with the city by licensed professionals, and work visible from the street in a landmark district gets its own review.
None of this is a reason to give up on a project. It is a reason to ask the building first and shop second. The placement and approvals guide lists what to ask.
Lower the bill you already have
Not every problem needs new equipment. A steam system that is vented and balanced properly stops overheating half the building. A furnace filter, a sealed sleeve and a thermostat schedule cost little and work this week.